Case Study - Extension to warehouse , Sidcup, UK

Project data

  • Customer
  • Coca-Cola Enterprises Limited
  • Value
  • £844,000
  • Area
  • 16,145 sq ft
  • Procurement route
  • Single Stage Design & Build
  • Form of contract
  • JCT 2005 Design & Build
  • Programme duration
  • 33 weeks
  • Completion date
  • 03/02/2012
  • Project Manager
  • Faithful & Gould
  • Architect
  • Bond Bryan
  • Quantity Surveyor
  • Faithful & Gould
  • Structural Engineer
  • Waterman Structures Limited
  • M&E Engineer
  • Silcock Leedham

Introduction

ISG secured this design and build project with Coca-Cola Enterprises Limited, to enhance production facilities at its Sidcup manufacturing and distribution site. The fast-track scheme saw ISG extend an existing warehouse building to accommodate two new beverage production lines.

Coca Cola
Coca-Cola

The Project

The single-storey steel frame structure occupies an infill site between existing production facilities, at the world’s third largest independent Coca-Cola bottler. ISG also created a new recycling shelter as part of the project and carried out a range of hard landscaping finishes. Working across a busy, live site, we developed a robust schedule of works to ensure there was no disruption to production during the project.