Blog update 2: A good foundation

Eden School blog update 2

Welcome to your second update – and things are certainly moving on visibly. After four weeks on site we are now coming to the end of the reduced level dig and bulk muck shift.

Eden_band11Over 3,000 cubic metres of soil and clay have been stripped and either relocated on site or moved off site for recycling, both extending and levelling out the area in preparation for the construction of the new building.

A retaining wall has also been constructed adjacent to the existing playing field to keep the ground at the level now required.

Eden School community site

 

Eden_band13

Eden_band14