Case Study
Marlowe theatr

New Marlowe Theatre construction, Canterbury, UK

31 March 2011

This important regional arts scheme saw us demolish the existing theatre building, whilst retaining the fly tower, and creating a new enlarged theatre and performing arts facility.

Case Study
Whitworth Art Gallery Manchester

The Whitworth refurbishment, Manchester, UK

1 January 0001

We transformed the 125 year old Whitworth Art Gallery into a 21st Century gallery in the park.

Case Study
Hampden

Hampden Park construction, Glasgow, UK

1 January 0001

ISG was instructed to extend and upgrade the North, East and West stands at Hampden Park. The project improved spectator facilities and accessibility by providing additional concourse area, catering facilities, lifts and new toilets in the North Stand.

Case Study
deeside

Deeside Leisure Centre construction, Queensferry,UK

1 January 0001

A strategic framework with Alliance Leisure Services commenced in July 2010 when we were contracted to deliver the first of three phases of work, with a total value of £4 million, at Deeside Leisure Centre in Queensferry.

Case Study
Leyton_Lesiure_Centre

Leyton Leisure Centre refurbishment, London, UK

1 January 0001

This project was part of a £25 million four-year framework to redevelop the leisure facilities for the London Borough of Waltham Forest.

Case Study
Velodrome

London 2012 Velodrome construction, London, UK

1 January 0001

The 6,000 seat London 2012 Velodrome hosted the Olympic and Paralympic indoor track cycling events and is now open for use by the general public.

Case Study
Shrewsbury

Shrewsbury Museum and Art Gallery restoration and refurbishment, Shrewsbury, UK

1 January 0001

This regeneration project with Shropshire Council re-developed the Music Hall, one of Shrewsbury’s most important architectural landmarks.

Case Study

The Velodrome, London, UK

1 January 0001

Case Study
OLYMPIC_OVERLAY

Olympic Overlay works design and new build, UK

1 January 0001

Our Olympic journey began in 2009 with the construction of the London 2012 Velodrome and led to us providing the £300 million+ ‘event architecture’ for the ‘greatest show on earth’ with the biggest Overlay project in the history of the Olympic Games.

Case Study
ROOFWALK

Up at The O2 designa and build, London, UK

1 January 0001

The project saw the creation of a unique and daring visitor attraction at The O2. Conceived by architects Rogers, Stirk, Harbour and Partners alongside Buro Happold, it features a tensile cable and fabric walkway, with a viewing platform above the corona of the iconic structure.