Case studies

Showing 1-10 of 29

View: Global site All sites Current site

Case Study

The Goring Dining Room refurbishment, London, UK

1 January 0001

Situated in Belgravia, close to Buckingham Palace, The Goring Hotel is a long time favourite with international royalty and celebrities. It is the only privately owned 5 star hotel in London and boasts an award-winning restaurant famed for its very British cuisine.

Case Study

The Savoy Grill fit out, London, UK

1 January 0001

Celebrity chef and Michelin Star winner Gordon Ramsay reappointed ISG for circa £600,000 fit out of the Savoy Grill. Located on The Strand, the grill was designed to seat approximately 130 diners in modern comfort without losing any of the charm that the Savoy Grill has long been famous for.

Case Study
United airlines

United Airlines Terminal 2 Airport Lounges fit out, Heathrow, UK

1 January 0001

We were chosen by United Airlines to fit out their Club Lounge facilities. Heathrow’s new Terminal 2B was completed in spring 2014, with the lounge at Terminal T2A currently on site.

Case Study
united airlines

United Airlines Terminal 2 fit out, Heathrow, UK

1 January 0001

We were chosen by United Airlines to fit out their Club Lounge facilities. Heathrow’s new Terminal, 2B was completed in spring 2014, with the lounge at Terminal T2A still currently on site.

Case Study

Bread Street Kitchen fit out, London, UK

1 January 0001

The multi-million pound, awarding-winning fit out project comprised of the installation of both a lift and a dramatic, 8.5 metre-high feature staircase. We also constructed a blackened steel and brass mesh, which incorporates viewing platforms looking out over the ground floor wine bar.

Case Study

The Goring Hotel refurbishment and restoration, London, UK

1 January 0001

ISG was chosen to refurbish and restore the family heritage of The Goring Hotel. We carried out three separate projects across the grand old hotel comprising the refurbishment of the restaurant, sitting room, bar, terrace and bedroom suites.

Case Study
St Martins Lane Hotel

St Martins Lane Hotel fit out, London, UK

1 January 0001

ISG recreated the St Martins Lane Hotel as a five star hotel that offers a fresh take on luxury accommodation by utilising modern materials.

Case Study
ShangriLa

Shangri-La Hotel spa gymnasium construction, Kuala Lumpur, Malaysia

1 January 0001

ISG provided the construction services for the new Spa and Gymnasium with the Sultan Ismail Shangri-La. This marked a significant upgrade for the hotel, transforming it into a five star facility.

Case Study

The Kensington Hotel refurbishment, London, UK

1 January 0001

ISG’s award winning work at The Kensington Hotel included a full refurbishment of the hotel together with the meeting and conference rooms. This encompasses the boardroom an antique table that can sit 30 in addition to the morning and drawing rooms set on the ground floor of the listed regency townhouse.

Case Study
Lancaster hotel

Lancaster Hotel refurbishment, London, UK

1 January 0001

The Lancaster refurbishment project was one the most expansive our team has undertaken to date. With sufficient facilities to host 1,800 people across two rooms, it also comprises enough rooms to accommodate over 1,000 people per night.

Page 1

Page: 1 2 3