Project data

  • Customer
  • CMS
  • Area
  • 160,000 sq ft
  • Procurement route
  • Lump sum
  • Programme duration
  • 24 weeks
  • Completion date
  • 31 January 2015
  • Project Manager
  • Gardiner & Theobald
  • Architect
  • MCM Architecture/KKS
  • Quantity Surveyor
  • Gardiner & Theobald
  • Structural Engineer
  • Elliott Wood
  • M&E Engineer
  • ChampmanBDSP

Introduction

ISG’s fit out project for CMS at Cannon Place, London, won the Best Fit Out of Workplace at the British Council for Offices (BCO) London & South East Awards 2016.

CMS legal office fit out
CMS fit out London -ISG

The project

One of many logistical challenges involved the manoeuvring of a single 14-metre, three and a half tonne solid steel beam which had to be installed into the building in one piece.

CMS was relocating from their established offices to a new 160,000 sq ft open plan space at Cannon Place.

The project involved installing two feature staircases linking all three floors. On the first floor, the team designed a brand new reception complete with a striking 17th century map of London.

A new staff restaurant was installed on the first floor. The award winning studio-style open plan fit out also included new IT infrastructure.